PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct and pipe hangers at the 2nd floor Facing West (800x600).jpg Installed gas piping risers at the 2nd floor by Elev. 5,6 Facing West (600x800).jpg Patching Stair -2 at the 1st floor Facing South (800x600).jpg Started Fireproofing at the 1st Floor Facing West (800x600).jpg Take off the pocket forms at Stair -2 (800x600).jpg
Previous page Take off the pocket forms at Stair -2 (800x600)
Take off the pocket forms at Stair -2 (800x600)